Skip to content
Water from the new submersible pump at the British Embassy, Addis Ababa

Project · British Embassy

A turnkey groundwater source

A complete groundwater source: survey, a 250 m well, and a submersible pump connected to the tank.

Well depth
250m
Completed
2026

The job

In 2026 we delivered a complete groundwater source for the British Embassy compound in Addis Ababa, as one turnkey project.

Turnkey means the embassy dealt with one contractor, accountable for every stage, instead of coordinating a surveyor, a driller and a pump supplier separately.

What we did

We ran the project in four stages, each one feeding the next:

  1. Investigation. A hydrogeological and geophysical investigation of the compound, to help locate productive water-bearing ground before a rig moved, so the well is sited on the evidence.
  2. Drilling. Drilling and construction of a 250 m well.
  3. Pump. Supply and installation of a submersible pump with all its accessories.
  4. Connection. The pump connected to the water tank, so the well, the pump and the tank work as one system.

The result

The embassy has a working groundwater source: a 250 m well, a submersible pump, and the tank connected to it, finished in 2026.

Because one contractor ran every stage, what the investigation found guided the drilling, and the well guided the pump, with no hand-offs between firms.

Services on this project

Client
British Embassy
Place
Addis Ababa
Year
2026
Scope
Survey · Drilling · Pump and tank connection
Well depth
250 m
Discuss your project

On site

Planning a water project?

Tell us where your site is and what you need. We reply with a clear next step.