The job
Chaka House is the deepest well Liyat Construction has completed. In 2022 we drilled it to 600 m in Addis Ababa for the Chaka House development, working for Palace Administration and Etoile GC PLC.
At this depth the work depends on the rig, the casing and the crew, and every decision counts for more the deeper the borehole goes. It is the job that sets our depth record.
What we did
Our drilling team built the whole well:
- Drilling to 600 m. A truck-mounted rig drilled the borehole to 600 m. Our rigs drill by mud rotary and DTH (down-the-hole hammer), so one crew can work through soft ground and hard rock.
- Casing in three sizes. We lined the borehole with 14-inch, 10-inch and 6-inch casing. A deep well is cased in steps, wider at the top and narrower below, so the steel holds the borehole open all the way down.
Our drilling depth is up to 800 m, so 600 m sits well inside it.
The result
A 600 m well for the Chaka House development, completed in 2022 and still the deepest on our list of completed projects.
It is also part of a record that runs from 100 m at a salt works in Afdera to 600 m here in Addis Ababa: more than 50 wells and more than 12,000 m drilled since 2019.