Two wells for the airline compound

Drilling and construction of two 500 m wells, with a pumping test confirming a yield of 40 litres per second.

Tested yield
40L/s
Depth of each well
500m
Completed
2024

The job

In 2024 we drilled, tested and equipped two 500 m wells in the Ethiopian Airlines compound in Addis Ababa, working on behalf of Kibish Construction, the main contractor.

It was a job for the whole life of a well, not only the drilling. Each well was taken from the first metre of the borehole to a tested water supply with its pump installed, and the wells were proven before anyone designed the system around them.

What we did

Our drilling, pumping-test and installation teams worked through four stages:

  1. Drilling and construction. We drilled and constructed both wells to 500 m.
  2. Well development. We developed the wells to clear the borehole, so the water runs clear and the yield is not held back by drilling debris.
  3. Pumping tests. We pumped the wells at measured rates and recorded how the water level fell and recovered, reading the flow at a V-notch tank. A pumping test shows what a well can deliver, and what it can keep delivering.
  4. Pump installation. We installed the pumps, so the wells left our hands as working supplies, not as holes in the ground.

Our pumping-test crew brings its own submersible pumps, crane and generators to site, which is why one contractor could drill the wells and prove them.

The result

The pumping test confirmed a yield of 40 litres per second.

That figure matters because the pumps and the pipework are chosen from it. The test verified the capacity of the wells and gave the performance data for selecting the pumps and designing the distribution system, so the design starts from measured performance, not from an estimate.

Two tested wells, finished in 2024, for the national airline.

Services on this project

Client
Ethiopian Airlines
Place
Addis Ababa
Year
2024
Scope
Drilling · Pumping test · Pump installation
Depth of each well
500 m
Tested yield
40 L/s
Discuss your project

On site

Planning a water project?

Tell us where your site is and what you need. We reply with a clear next step.